Home     Discussion Forum     Technical Info     Our Service     Photo Gallery     Installation Process     Contact Us     Privacy Statement     Links     Tile Setters Directory




~ Rob Z Remodeling ~
Loudoun County, Virginia, USA.

Robert Zschoche Remodeling, LLC
VA Class A 2705 87502
MD MHIC 85036

Here is the wall that we will start hanging cabinets on. We usually do the upper cabinets first. All of the holes have been taped and finished with EZ Sand 20. The layout lines are drawn on the walls.
The ductwork is installed and ready for the range hood.
The corner cabinet is set first. Plenty of shims are used to plumb the cabinet.
Cabinets are screwed together and to the wall, with shims to keep them plumb.
Here I am cutting the extended stile on the side of this cabinet. It's hard to know what the exact dimension will need to be for the cabinets at the end of a wall, so an extension was included on the face frame of the cabinet that goes over the fridge.
Here is one wall of cabinets. The cabinet in the middle will have a shelf custom made to hold the microwave. There is an outlet roughed in this area. There are two other outlets at counter height, and another outlet behind the fridge. The cabinets are held a bit off the ceiling, since there will be crown molding above the cabinets doors.

Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7 | Page 8 | Page 9

Back to Home Page