 |
All work by: Harry Dunbar
Barrie, Ontario
Phone: (705) 424 - 5144
Toll Free: 1-866-837-7773
(Toll Free for Ontario residents)
Email
|
Ceramic Tile Shower construction including mortar beds and waterproofing.
More Photos of this Ceramic Tile Shower.
|
 |
Building a waterproof and vapor-proof steam shower with curved ceiling and benches. Wedi Backerboard (1" thick) was used for the walls.
More pictures of this ceramic tile shower. |
 |
Construction of a shower with NuHeat floor warming system used to heat the bench and showerpan. Wedi Backerboard was used for walls and ceiling and Kerdi was used to waterproof the shower pan.
(This project is current and not yet complete.)
More pictures of this ceramic tile shower.
(NuHeat Floor Heating System installed in shower.) |
 |
Re-built ceramic tile walls, 2 niches and waterproofing for tub-surround. Also, heated marble tile floor system.
More Photos of this Ceramic Tile Shower.
|
 |
Complete bathroom renovation including construction of new shower, removing mold and other damaged materials, building a mortar bed, applying a waterproof system (Laticrete 9235) and re-routing plumbing. Mortar bed walls with lath and fat-mud was used in this shower construction.
More Photos of this Ceramic Tile Shower. |
 |
Complete construction of shower and heated floor system.
More Photos of this Ceramic Tile Shower. |
 |
Complete construction of Shower and Jacuzzi including mortar beds and waterproofing.
More Photos of this Ceramic Tile Shower.
|
 |
Basic ceramic tile shower using Kerdi waterproof membrane over cement board.
More pictures of this ceramic tile shower. |
 |
This shower was a re-build, which also required me to increase its size to customer specifications. There was severe mold growth and water damage which required extensive repair.
More pictures of this ceramic tile shower.
|
 |
Complete construction of a shower using the Kerdi waterproof system. Tumbled marble tile and niche.
More pictures of this ceramic tile shower. |
 |
Re-built using a mortar bed to replace the water damaged and poorly constructed backerboard installation.
More pictures of this ceramic tile shower. |
 |
Renovation of bathroom. Removal of cast-iron sunken tub ... what a nightmare! Installation of Ditra isolation membrane, construction of Jacuzzi frame and waterproofing. I used Wedi Backerboard for the deck of the jacuzzi.
More pictures of this ceramic tile shower. |
 |
Not grouted in this photo.
Extensive preparation and tile work including the Kerdi waterproof system.
More pictures of this ceramic tile shower. |
 |
Shower pan construction using the Kerdi system (drain and membrane). Heated floor installation with Ditra membrane in main floor area of bathroom.
More pictures of this ceramic tile shower. |
 |
Kerdi waterpoof membrane, mortar bed / shower-pan with Kerdi drain and HardiBacker for the main bathroom floor area.
More pictures of this ceramic tile shower. |
 |
Severe water and mold damage was repaired by completely gutting the entire bathroom. Wedi Backerboard was used to create a secure and waterproof ceramic tile system.
More pictures of this ceramic tile shower. |
 |
Extensive shower reconstruction and tile work including the Kerdi waterproof system. HardiBacker board used on bathroom floor. Split-faced stone on bathroom wall and marble mosaic (basket-weave) on floor.
More pictures of this ceramic tile shower. |
 |
|
 |
|
 |
Waterproof shower with Wedi Backerboard, Kerdi shower pan and Kiesel liquid waterproofing.
More pictures of this ceramic tile shower.
|
 |
.... See More. |
 |
A complete bathroom renovation. Kerdi membrane was used to waterproof the shower pan and Wedi Backerboard was used for all other surfaces within the shower to create a completely waterproof shower. Ditra was used for the main floor of the bathroom.
More pictures of this ceramic tile shower. |
 |
Bathroom renovation using Ditra on the floor and Wedi Backerboard for the tub surround.
More pictures of this ceramic tile shower. |